Biofill digester

Provide the above materials and pay 550.00 for other materials, chemicals and workmanship for the standard Biodigester installation (single room self-contained or chamber and Hall self-contained);,Materials ; * 2 bags of cement * 4 sacks of chipping * 8 sacks of sand * 5" blocks 30 pieces and * 4" pipes 2 pieces,☎️ Call/what's app 0246769614/0556462171

GHS550

seller's name'
Name: Atiefu O
seller phone number
Location: Accra, Ghana
uploaded on
Date: 09 November, 2021

Contact Seller

Product Images

product image 0
Image 1 of 4
product image 1
Image 2 of 4
product image 2
Image 3 of 4
product image 3
Image 4 of 4