Cobble half brick paving from ground preparation, good leveling, water directions, supply of all material, rubble removal and labor R150 per square meter. Hot smooth tar surfacing with ground preparation, G5 stone and 40mm thickness of tar R160per square meter. Bevel/Interlocking paving it's R250 per square meter Tar surfacing from R140 per square meter For more info call/whatsapp 0677854683
ZAR66